Resources

Related Documents

DRAFT Route 2 Reconstruction at Concord Rotary Secondary Study Area Corridor Analysis (April 29, 2009)
  - Executive Summary and Analysis (Part 1)
  - Individual Intersections Descriptions (Part 2)

November 24, 2008 Concord Board of Selectmen Presentation
Public Workshops #1 and #2 summary comments and responses
Public Workshop #2 Handouts
Project Limits Map
Alternatives 3, 5 and 7 maps 
Secretary's Certificate for the Notice of Project Change (May 2008)
Secretary's Certificate for Environmental Notification Form (April 2003)

Route 2 Improvements from Route 111 in Acton to Baker Avenue in Concord: A Feasibility Study (February 2003)
- Appendix B: Concord Rotary Design Alternatives
- Appendix C1: Alternative Packages for Route 2 in Acton and at Concord Rotary
- Appendix C2: Alternative 5A
- Appendix C3: Alternative 5B
- Appendix C4: Alternative 1A
- Appendix C5: Alternative 1B
- Appendix C6: Alternative 1C
- Appendix D: Existing Traffic Volumes and 2020 Forecasts for Alternative Packages
- Appendix E: Evaluation of Improvement Alternatives
- Appendix F: Analysis of Additional Acton Packages
Route 2 Long Range Feasibility Study in Acton, Concord and Lincoln (August 1996)
- Traffic Peak Hour Volumes
- Appendix 1: Traffic Model Development
- Traffic Model Network
- Appendix 2: Related Memos
- Appendix 3: Selected Traffic Counts
- Appendix 4: Letters


Links

Massachusetts Department of Transportation
MassDOT Highway Division
Executive Office of Energy and Environmental Affairs
Transportation Research Board's Evaluation of the Use and Effectiveness of Wildlife Crossings
WBUR's report "Wildlife Tunnels are Super-Highways for Animals"